The Blueprint series

Control Panel CP-01, explained part by part

Hover over or tap any part of the front, the inside or a note to see what it does and why it matters.

Drawing HT-N-CP-014-GA
General arrangement of Control Panel CP-01: the front view with the operator screen, isolator and emergency stop, and the internal view with the PLC, power supply, circuit breakers and field terminals.
Hover or tap a part

The supply upstream

Hardtech HV works on high voltage systems up to 33kV nationwide, including switchboards, transformers and substations.

Visit Hardtech High Voltage (HV)

The plant it controls

Hardtech Northwest works on electrical and mechanical installations across the North West.

Visit Hardtech Engineering Services (ES)

Ask an engineer

Got a question about a part of this drawing, or a job like it? Send it to Hardtech North and an engineer will get back to you.

We'll use your details to answer your question. See our privacy policy.

Get the Blueprint Pack

Three one-page checklists, for HV switchgear, control panel drawings and pump installations, each with a worked example drawing. Free PDF.

We'll use your details to send you the Pack and follow up about it. See our privacy policy.